Infrastructure & Capital Projects - Data Center Construction Project Engineer III, ANS
Accenture
This job is no longer accepting applications
See open jobs at Accenture.See open jobs similar to "Infrastructure & Capital Projects - Data Center Construction Project Engineer III, ANS" Imagine.
Charlotte, NC, USA
USD 90k-115k / year
THE WORK:
You’ll study time, motion, methods, and speed involved in maintenance, production, and other operations to establish standard production rate and improve efficiency.
You’ll interpret engineering drawings, schematic diagrams, or formulas and confer with management or engineering staff to determine quality and reliability standards.
You’ll read worker logs, product processing sheets, and specification sheets to verify that records adhere to quality assurance specifications.
You’ll aid in planning work assignments in accordance with worker performance, machine capacity, production schedules, and anticipated delays.
You’ll prepare charts, graphs, and diagrams to illustrate workflow, routing, floor layouts, material handling, and machine utilization.
You’ll observe workers using equipment to verify that equipment is being operated and maintained according to quality assurance standards.
You’ll observe workers operating equipment or performing tasks to determine time involved and fatigue rate using timing devices.
You’ll evaluate data and write reports to validate or indicate deviations from existing standards.
HERE'S WHAT YOU'LL NEED:
• 10+ years experience required.
BONUS POINTS IF YOU HAVE:
- Creativity, verbal and written communication skills, analytical and problem solving ability.
- Team player and detail oriented.
- Ability to make sketches, engineering drawings and common computations.
- Ability to read and interpret blueprints, technical drawing, schematics and computer-generated reports.
- Previous experience with computer applications and software related to engineering field, such as Computer Aided Design (CAD).
90000 - 115000 USD a year
